New Construction

View Project...

Kavli Foundation

New construction

PROJECT LOCATION:
5707 and 5710 Mesmer Avenue
Los Angeles, CA 90230

View Project...

Grafton Lofts

Ground-up, three-story, mixed use building with one level of underground parking, a ground floor parking garage and three commercial units with two levels of residential units above.  Included installation of new underground electrical service, transformer pad, switchboard and communications.

PROJECT LOCATION:
1605 W Grafton Street
Los Angeles, CA 90026

View Project...

2121 Avenue of the Stars, Outdoor Workspace

Exterior improvements, including extensive concrete, stone tile paving, planters, cantilevered umbrellas, landscaping and lighting

PROJECT LOCATION:
2121 Avenue of the Stars
Los Angeles, CA 90067

View Project...

Vista Canyon

New 60,000 SF cast-in-place concrete, 3-story creative office building

PROJECT LOCATION:

View Project...

USC Wrigley Boone Center Housing

6 custom cottages built at Terminal Island in Los Angeles, were then barge transferred to Catalina Island to be set on new foundations. Cottages were stitched together at the site to become 3 duplexes. Traditional red tile roofs, custom plaster finish, custom kitchens and baths. Site work included drought tolerant and native landscape, porphyry pavers, custom fountain, pre-cast concrete, and extensive gabion retaining wall system.

View Project...

USC Galen Center

New 2-story structure adjacent to Heritage Hall with weight room addition below grade, 1st floor new full service kitchen, dining area with custom booths, high end audio visual system, custom displays, bathrooms, courtyard and deck.

View Project...

Rosewood

54-unit low income Senior Housing, 2 levels parking below grade, 5 levels of new structure above.
Features: Wood siding, LEED certified Silver, thermal solar, 28 KW photo voltaic system, courtyard, community room, and 7 stop gearless traction elevator.

FSY Architects

View Project...

Northrup Grumman Pedestrian Bridge

New enclosed pedestrian walkway with high security doors, new structural steel frame with steel columns and foundations, new flooring, ceiling system with lighting, power and data, new custom glass system with blast-proof film and new roof with drains and fire protection.

View Project...

Mission Without Borders

Tilt-Up & Interior Construction. Site Work, Office & Warehouse